Waferpedia

Comparison ledger

0041-39086 ESC PartversusTCP 9600 SE Metal

Applied Materials 0041-39086 ESC Part, Lam Research TCP 9600 SE Metal, side by side. Every value shown is drawn from the cited encyclopedia entries.

Side-by-side comparison of selected equipment models
Attribute
0041-39086 ESC PartApplied Materials
TCP 9600 SE MetalLam Research
OEMApplied MaterialsLam Research
CategoryEtchEtch
Wafer size——
Process node——
Introduced——
Production run——
Lifecycle——
Lifecycle milestones——
Control system——
Generation——
Family—Lam Research TCP 9600
Specifications
Install Type—Through-the-wall[1]
Software Type—Lam Envision[1]
Software Version—E 1.5.2[1]
Configuration—SECS Interface[1]
Electrical Requirements—208V/80A[1]
PM 1 / Main Chamber—Metal Etch[1]
Helium Cooling MFC Type—UNIT UPC8130[1]
Main On-Board AC Distribution Type—Fused[1]
DSQ Type—Hinged[1]
Endpoint Type—Monochromators[1]
Voltage—208 V[2]
Wafer Sizes—6 inch, 8 inch[3]
SECS Interface—Yes[1]
Mainframe Type—Stand Alone Etcher Mainframe[1]
Process Module—PM 1 / Main Chamber: Metal Etch[1]
Gas Box—Orbitally Welded Gas Box[1]
Backside Helium Cooling—Yes[1]
Heated Pumping Manifolds—Yes[1]
On-Board RF Generators—Yes[1]
WVDS—Yes[1]
Indexers—Hine 38A Indexers[1]
Endpoint Detection System—Yes[1]
Endpoint Lam PN—830-330546-001[1]
Chamber Liner—Yes[1]
Chamber Anodization Condition—Good[1]
Electrode Fixed Gap—Yes[1]
Wafer Clamp Type—ESC (Electrostatic Chuck)[1]
ESC Type—Polyamid[1]
Gate Valve Type—Pendulum[1]
TCP Coil Size—6"[1]
Chiller Make/Model—Edwards TCU40/80[1]
Chiller Electrical Requirements—200/208VAC / 25A[1]
Chiller Number of Cooling Channels—One[1]
Wafer Clamp—ESC[1]
Gate Valve—Pendulum[1]
# of Cooling Channels—One[1]
Gas Panel—Standard[1]
Chamber Process—Metal Etch (PM 1 / Main Chamber)[1]
RF Generators—On-Board[1]
Main AC Distribution Type—Fused[1]
Electrode Type—Fixed Gap[1]
Chiller Model—Edwards TCU40/80[1]
Number of Cooling Channels—One[1]
Additional Electrical (208 V variant)—208 V[2]
OEM—Lam Research[1]
Model—TCP 9600 SE[1]
Category—Etch[1]
Main chamber—Metal Etch[1]
Chiller—Edwards TCU40/80[1]
Gas panel—Standard Gas Panel[1]

Plan your fab

Building a Etch process? Get a complete equipment list.

Open the fab equipment planner →
Sources (3)Every fact above is drawn from these public sources
  1. [1]inventory listing
  2. [2]inventory listing
  3. [3]Equipment inventory listing